What is footing depth?
Enter the vertical thickness of the concrete pad from the bottom of the footing to the top surface.
Calculate concrete volume for isolated footings by length, width, depth, and quantity.
Length × Width × DepthSingle footing volume × QuantityTotal volume × (1 + Wastage ÷ 100)Convert m³ to ft³ for orderingEnter the vertical thickness of the concrete pad from the bottom of the footing to the top surface.
5–10% is typical. Irregular excavation or stepped footings may need more.
For continuous strip footings, use length as the run and width as the strip width.